Please submit this form if you wish to request fire hydrant (s) to be flowed and data sent to you for your construction project. Currently, there is no fee for this service; however, please allow for a minimum of two weeks for us to process your request.
Questions about this process or this form should be directed to the Fire Department, Fire Prevention Division, at (509) 585-4352.
Submit this form only when the current and forecasted temperatures are above at least 40 degrees for a solid seven day time frame. Fire Hydrant flows or accessing hydrants unless under emergency conditions will not be conducted during times that temperatures are under 40 degrees.
By checking this box I understand the above requirements.
This field is not part of the form submission.
* indicates a required field