2024 Bituminous Surface Treatment (P2402)

Project Description

This project includes the application of bituminous surface treatment (BST) seal coat of 3.9 Miles of paved residential streets and arterial streets within the Kennewick City limits. All work and materials shall be in accordance with WSDOT Standard Specifications Section 5-02. Work includes, but is not necessarily limited to pavement patching of select areas for BST streets, pre-project sweeping by City crews, traffic control, covering and uncovering of utilities, removal of plastic pavement markings, supply, placement and removal of temporary flexible raised pavement markers, fog seal of pavement patches, constructing a single or multiple course BST, post project sweeping, sweeping sidewalks as required to remove any debris that results from the project, haul and disposal of picked up excess rock to a City-provided waste site, application of fog seal, paint striping, and preformed thermoplastic pavement markings.

See attached map for streets identified for BST treatment for 2024.

Vicinity Map

More Info

Start Date:
Summer 2024
Funding Source:Pavement Preservation Fund


Status

Project is currently being advertised for a contractor.  Construction is anticipated to occur between June 10, 2024 and July 26, 2024.  

Last updated 1/29/2024