WWTP Non-Potable Water System (P2113)

Project Description

This project is for the construction of the Wastewater Treatment Plant Non-Potable Water System which will supply treated effluent wastewater throughout the WWTP to be used for wash water irrigation, seal water, etc.  The existing non-potable water system will be upgraded with a new intake system, a dry well with two pumps, an automatic self-cleaning filter, an emergency potable water connections, approx. 1,200 LF of 8" distribution piping, approx. 100 LF of 6" distribution piping, and several connections/disconnections to/from existing potable and non-potable service lines.

More Info

Start Date:
October 2023
Est. End Date:
February 2024
Funding Source:
Water/Sewer Fund

Contact Info

Contractor: DDB, LLC. - Tom Reif, Project Manager (740)258-9520

City of Kennewick Project Engineer: Caleb Shannon (509)585-4289

City of Kennewick Project Inspector: Joe Robles (509)231-4939

Status

***Project is temporarily suspended***

This project is currently suspended due to material delays.  It is estimated work will resume February 2024..

Last updated 1/26/2024