Metaline & Keller/Johnson/Irby Sewer Replacement (P2027-23)

Project Description

The City of Kennewick Public Works Department is planning to replace and upsize existing six-inch (6.0”) concrete main located within two (2) separate easements within the same neighborhood. The existing pipes will be replaced with a new eight-inch (8.0”) pipe from manhole to manhole as well as reconnecting existing sewer services. Installation of the new piping will involve replacing the existing mains on private property within a ten-foot (10’) easement, five-feet (5’) on each side of the back property line. Pipe bursting is the required method of installation in order to replace and upsize these existing pipelines and to minimize construction impacts to private properties.

More Info

Start Date:
Spring/Summer 2023
Est. End Date:
2023
Funding Source:
Sewerline Renewals & Replacements

Click here to view the updated project flyer! (May 2021)

Status

On May 23, 2023, a request for bid has been issued.  Bids are due no later than June 6, 2023. 

Last updated 5/25/2023